{"attachments":[{"id":"81242342-2c17-4a15-980d-66a43ed207e7","project_id":"3b85f014-0113-49f1-a3bd-c6958f33256e","url":"https://assets.ctfassets.net/qezfe50w6p6b/4IWqXqRiV52R4t4jXI59TV/911892621dc7e050ee8d22cfae7f1a51/Depot_Charging_Scheme_-_FAQ_05.06.docx","filename":"Depot_Charging_Scheme_-_FAQ_05.06.docx","mime":"","bytes":0,"key_points":"","extract_status":"pending","downloaded_at":null,"created_at":"2026-09-04T15:32:11.376832+02:00"},{"id":"5cc3c605-9da1-4250-bb83-e5e60b58ac70","project_id":"3b85f014-0113-49f1-a3bd-c6958f33256e","url":"https://assets.ctfassets.net/qezfe50w6p6b/5HwZcWiEGHgfYeItmHbXYW/a155e1c3c5f4abaae763fc3b1f04423b/Depot_Charging_Scheme_-_Overview_of_Application_Process.docx","filename":"Depot_Charging_Scheme_-_Overview_of_Application_Process.docx","mime":"","bytes":0,"key_points":"","extract_status":"pending","downloaded_at":null,"created_at":"2026-09-04T15:32:11.386+02:00"},{"id":"f5cc1bae-3551-4c70-8edc-59be300fb64a","project_id":"3b85f014-0113-49f1-a3bd-c6958f33256e","url":"https://assets.ctfassets.net/qezfe50w6p6b/7HBdvj6TZ4ywmr5wnOxrf5/e6370c54d245ced48a13d6bbc42c6111/Depot_Charging_Scheme_-_Letter_of_Intent.docx","filename":"Depot_Charging_Scheme_-_Letter_of_Intent.docx","mime":"","bytes":0,"key_points":"","extract_status":"pending","downloaded_at":null,"created_at":"2026-09-04T15:32:11.394545+02:00"},{"id":"0a963c09-6ee1-469b-ad0a-5edaa81539c3","project_id":"3b85f014-0113-49f1-a3bd-c6958f33256e","url":"https://assets.ctfassets.net/qezfe50w6p6b/6fqSZk5syTLa8PWtBVClwZ/74392822748a6f5bcf5ef51f729f9234/Depot_Charging_Scheme_-_Workbook.xlsx","filename":"Depot Charging Scheme - Workbook.xlsx","mime":"","bytes":0,"key_points":"","extract_status":"pending","downloaded_at":null,"created_at":"2026-09-04T15:32:11.400239+02:00"},{"id":"b76332f2-7e4b-4653-b121-68409790a396","project_id":"3b85f014-0113-49f1-a3bd-c6958f33256e","url":"https://assets.ctfassets.net/qezfe50w6p6b/5NcNE8hoMdHkPNNRCNv7qw/b8049664571fe789fa0eb81ef413d2c6/Depot_Charging_Scheme_-_Grant_Funding_Agreement_DRAFT.docx","filename":"Depot Charging Scheme - Grant Funding Agreement DRAFT.docx","mime":"","bytes":0,"key_points":"","extract_status":"pending","downloaded_at":null,"created_at":"2026-09-04T15:32:11.406005+02:00"},{"id":"f47debd4-fa82-4a6c-b58a-7712a2001c7f","project_id":"3b85f014-0113-49f1-a3bd-c6958f33256e","url":"https://assets.ctfassets.net/qezfe50w6p6b/6clbwzfBO42Dadjb9mPWrZ/bad171b624c56d81ac189c162afe7fba/Depot_Charging_Scheme_-_Application_Form.docx","filename":"Depot_Charging_Scheme_-_Application_Form.docx","mime":"","bytes":0,"key_points":"","extract_status":"pending","downloaded_at":null,"created_at":"2026-09-04T15:32:11.408354+02:00"}],"project":{"id":"3b85f014-0113-49f1-a3bd-c6958f33256e","title":"Depot Charging Scheme","title_normalized":"depotchargingscheme","sponsor":"","agency":"","kind":"grant","taxonomy":["淨零與能源"],"region":"英國","deadline":null,"starts_at":null,"announced_at":null,"budget":"£170 million total programme; £66 million available in two windows (£28M window 1, £38M window 2); up to £1 million per applicant (70% of charge point and civil costs)","eligibility":"1. Their fleet includes (or will include in future) at least one battery electric van, HGV or coach, and their application will quantify the impact of this on their EV charging needs.\n2. They are registered and operate in the UK* and their organisation and vehicle fleet has been operating in the UK for at least 1 year at the time of application.\n3. They own or lease one or more UK depot(s).\n4. Funding must be used only within the UK.\n5. A senior leader in their organisation has approved their proposal.\n6. They consent to participate in ongoing monitoring and evaluation activities, including physical site audits/visits.\n7. They consent not to apply for, or obtain, similar Government funding in respect of any part of the funded activities.\n8. They consent to the primary users of the funded infrastructure being commercial vehicles.\n9. If the infrastructure is shared with other fleet operators, the pricing model will be based on cost recovery for at least three years after the grant is awarded.\n10. If successful, they will use the funding to install charging infrastructure for battery‑electric vans, HGVs and/or coaches at their depot(s) by 31 March 2027.\n\n*This does not include the Crown Dependencies (Isle of Man, Jersey or Guernsey).\nAdditionally, they confirm agreement to the terms and conditions of the Grant Funding Agreement as part of their application, they note applications will be assessed on a first-come-first-served basis and they note expenditure will only be considered eligible if it is carried out after the Agreement has been signed.","summary":"The Depot Charging Scheme provides up to £1 million per organisation (70% of charge point and civil costs) to install charging infrastructure for battery‑electric vans, HGVs and coaches at UK depots, funded from a £170 million multi‑year programme with two application windows in 2026‑2028.","url":"https://find-government-grants.service.gov.uk/grants/depot-charging-scheme-1","url_status":"ok","url_checked_at":"2026-09-07T16:51:17.502865+02:00","source_id":null,"snapshot_id":"f36ba8e8-d314-4b20-926b-134d67af0b7f","spec_id":null,"lifecycle":"open","first_seen_at":"2026-09-04T15:32:11.293608+02:00","last_verified_at":"2026-09-04T15:32:11.318491+02:00","created_at":"2026-09-04T15:32:11.294383+02:00","updated_at":"2026-09-07T16:51:17.503849+02:00"}}