{"attachments":[{"id":"e7822b3e-f6d4-4c50-b6b3-8aaf7a2bca53","project_id":"bdb608de-a904-45a7-a9db-20239f3614bd","url":"https://assets.publishing.service.gov.uk/media/67e1417170323a45fe6a6fdb/dft-mds-analytical-annex.pdf","filename":"Maritime Decarbonisation Strategy Analytical Annex","mime":"","bytes":0,"key_points":"","extract_status":"pending","downloaded_at":null,"created_at":"2026-09-04T15:27:09.201449+02:00"},{"id":"ab3304ab-f6b0-4ac1-8810-1fdc844321f2","project_id":"bdb608de-a904-45a7-a9db-20239f3614bd","url":"https://iuk.ktn-uk.org/wp-content/uploads/2024/02/11312_UK-Transport-Vision-2050-2nd-edition-SP-Final.pdf","filename":"UK Transport Vision 2050","mime":"","bytes":0,"key_points":"","extract_status":"pending","downloaded_at":null,"created_at":"2026-09-04T15:27:09.205924+02:00"}],"project":{"id":"bdb608de-a904-45a7-a9db-20239f3614bd","title":"Zero Emission Vessels and Infrastructure 2: Electric Power","title_normalized":"zeroemissionvesselsandinfrastructure2:electricpower","sponsor":"Department for Transport","agency":"Innovate UK, part of UK Research and Innovation (UKRI)","kind":"grant","taxonomy":["淨零與能源","製造與材料"],"region":"英國","deadline":"2026-09-16T00:00:00Z","starts_at":"2026-03-26T00:00:00Z","announced_at":null,"budget":"up to £150 million","eligibility":"1. Total eligible project costs between £6 million and £60 million.\n2. Project must start by 1 April 2027.\n3. All grant funding must be claimed by 31 December 2029.\n4. Complete a non‑funded three‑year demonstration, starting by 1 January 2030 and ending by 31 December 2032.\n5. Maximum total project grant funding request ≤ £30 million, with no more than £20 million allocated to a single participant.\n6. Lead organisation must be a UK‑registered business of any size and must collaborate with either a UK‑registered ship owner/manufacturer/operator or a UK‑registered infrastructure owner/operator (e.g., port, harbour, marina, inland waterway authority, windfarm).\n7. Academic institutions cannot lead or work alone.\n8. Any funded organisation must intend to exploit the project results from or in the UK.\n9. Projects must start on the first of a month, even if non‑working day, and only after Grant Offer Letter approval.\n10. Lead and at least one other organisation must apply for funding when entering costs and include collaboration rationale.","summary":"The Zero Emission Vessels and Infrastructure 2: Electric Power competition offers up to £150 million in grant funding for UK‑registered organisations to develop, deploy and operate innovative clean maritime solutions—including 100% battery electric vessels, charging infrastructure and shore power systems—for a three‑year real‑world demonstration.","url":"https://apply-for-innovation-funding.service.gov.uk/competition/2435/overview/592ea5c1-f713-4654-bb5e-d6894cd06d86","url_status":"ok","url_checked_at":"2026-09-07T16:51:19.754686+02:00","source_id":null,"snapshot_id":"1c4fcfe2-fc4a-4113-993a-ada421ee9444","spec_id":null,"lifecycle":"open","first_seen_at":"2026-09-04T15:27:09.170224+02:00","last_verified_at":"2026-09-04T15:27:09.179975+02:00","created_at":"2026-09-04T15:27:09.171087+02:00","updated_at":"2026-09-07T16:51:19.756096+02:00"}}